IBM Office Complex
The factory applied
metallic urethane coating on the embossed steel composite panels covering
IBM's 2 million square foot office complex had begun to chalk and fade.
IBM needed a solution that would return the building to its original
brilliance.
The unique architecture
of the complex posed some challenges related to access and the extensive
landscaping had to be preserved in solving the problem.
On the advice of the
original supplier of the panels, Induspray
was chosen to test and provide the solution. After a detailed analysis of
the site was completed, test panels were prepared using specially designed
profiling equipment. Silicone caulking residue contamination on the panels
was completely removed as part of the preparation prior to the application
of the fluoropolymer refinishing system. To correct water drainage
problems, Induspray
also removed and then installed a new caulking system and flashing
retrofit on the whole complex.
Induspray
used environmentally friendly procedures and materials that addressed the
concerns of IBM and provided the most cost effective long-term solution.
|